Kakatiya Thermal Power Station is located near Warangal in Andhra Pradesh. The power plant is one of the coal based power plants of APGENCO
Power Plant
This power plant has been developed in 2 stages. The first stage comprises one 500MW unit was commissioned. Unit was synchronized with grid with oil firing on 31.03.2010 at 06:08 Hrs. The Coal firing was immediately taken up and the load was raised up to 84 MW and the Unit was in service with this load for nearly about 1 hour.[1].
Installed Capacity
Stage |
Unit Number |
Installed Capacity (MW) |
Date of Comisioning |
Status |
Stage I |
1 |
500 |
May, 2010 |
Running |
Stage II |
2 |
600 |
|
Under implementation |